- Small run-of-river hydropower plants with an installed capacity not exceeding 5 MW (subject to prior environmental compliance approval),
- Installation of wind turbines with a collective installed capacity not exceeding 10 MW (subject to prior environmental compliance approval),
- Biomass combustion systems generating heat and / or electricity (biomass sustainability assessment required)
- Solar-thermal water systems for the production of hot water for processes and / or space heating / cooling and / or sanitary water heating
- Solar-thermal low / high temperature drying systems
- Geothermal energy utilisation with / without heat pumps (drilling and pumping test)
- Biogas stations and / or engines (agriculture, municipal, industrial waste, sewage treatment)
- Solar photovoltaic power plants with installed capacity up to 2 MW
- Geothermal energy with / without heat pumps (drilling test)
Please contact the MorSEFF team to learn more about financing of stand-alone small-scale renewable energy projects.